Please wait a minute...
Submit  |   Chinese  | 
 
Advanced Search
   Home  |  Online Now  |  Current Issue  |  Focus  |  Archive  |  For Authors  |  Journal Information   Open Access  
Submit  |   Chinese  | 
Engineering    2019, Vol. 5 Issue (3) : 379 -383     https://doi.org/10.1016/j.eng.2019.04.001
Engineering Achievements |
Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland
Davide Fabbri
Lombardi Engineering Ltd., Minusio 6648, Switzerland
Abstract
Issue Date: 11 July 2019
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
Davide Fabbri
Cite this article:   
Davide Fabbri. Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland[J]. Engineering, 2019, 5(3): 379 -383 .
URL:  
http://www.engineering.org.cn/EN/10.1016/j.eng.2019.04.001     OR     http://www.engineering.org.cn/EN/Y2019/V5/I3/379
References
[1]   Leuenberger M. In the year of the tunnel. In: Proceeding of the Swiss Tunnel Congress 2016; 2016 Jun 15–17; Luzern, Switzerland. Zurich: Swiss Tunnelling Society; 2016. German.
[2]   H. Ehrbar, P. Zbinden. Organisation and processes. In: Tunnelling the Gotthard. Zurich: Swiss Tunnelling Society; 2016. p. 592-601.
[3]   Dix A, Smith M, Celestino T, Neuenschwander M. Contractual practice. 2015-Activity report of Working Group 3 [Internet]. Geneva: ITA-AITES [cited 2019 Feb 19]. Available from: https://www.ita-aites.org/en/wg-committees/working-groups/200-ita-active-working-groups/workinggroup-3-contractual-practices/894-2015-activity-report.
[4]   ITA-AITES. The ITA contractual framework checklist for subsurface construction contracts. Apr. ITA-AITES Report No.: 006
[5]   H. Ehrbar, P. Zbinden. Financing and cost management. In: Tunnelling the Gotthard Zurich. Regensdorf: Swiss Tunnelling Society; 2016. p. 614-623.
Related
No related articles found!
Copyright © 2015 Higher Education Press & Engineering Sciences Press, All Rights Reserved.
京ICP备11030251号-2

 Engineering